The Construction Source

All the best, The Editorial Team We will keep adding business units that enhance our offering and separate us from our competition. “ ” Editor From The Dear Reader, Welcome to the latest issue of Construction Source Canada, the magazine that highlights the best in building and building products across the country. In this edition, we’ve taken a look at a diverse array of contributors to the building industry, including builders, architects, engineers, municipalities with exciting infrastructure projects, and much more. Shield Architecture + Engineering, for example, is a business that does a little bit of everything – they are a multidisciplinary firm based in Sudbury, Ontario, known for delivering forward-thinking designs and innovative architectural, structural, mechanical, electrical, and civil engineering solutions to clients across the residential, commercial, institutional and industrial sectors. We spoke to Kristin Bietes, the firm’s lead architect, about that versatility and why it makes their work so enjoyable. We also highlighted some of the recent projects that benefited from their firm’s multidisciplinary nature – for example, their ongoing work at the Laurentian University, where they are in the middle of a multi-phase renovation project that has required a lot of problemsolving. The District of Saanich, meanwhile, is the largest and most populous municipality on Vancouver Island, and is currently in the middle of one of the most ambitious infrastructure pushes in its history. For more on that push, we caught up with Stacy McGhee, Program Manager of Strategic Facilities Planning within Saanich’s Engineering Department’s Facilities Division. We talked about how the district has been progressively addressing its infrastructure needs over the last few years and how important public engagement has been in their efforts. We also highlighted a recent marquee project, the new Fire Station #2, which is one of the first mass timber buildings in Canada designed to target a zero-carbon building standard, while also being equipped for post-disaster response – meaning it is engineered to stay operational following an earthquake or other major disaster. With that project, the District of Saanich is hoping to set a new standard that other municipalities can look to when planning their own post-disaster facilities. Then there’s AXIA, a multi-award-winning international architecture and design studio with offices in Toronto and Hong Kong. We spoke to founding partner Chris Wong about some of their awards – including and especially their recent wins for the Diwan, a multi-purpose event space set within the University of Alberta’s Islamic Garden. For those stories – and more stories about other industry leaders across the construction spectrum – just keep reading.

THE CONSTRUCTION SOURCE CANADA 1310 CREDITSTONE RD. CONCORD, ON L4K 5T7 • TEL: 905-738-8311 CONNECT WITH US AND DISCOVER WHAT IS POSSIBLE. VISIT: WINDSPEC.COM ARCHITECTURAL ALUMINUM SOLUTIONS DESIGNED, ENGINEERED, AND MANUFACTURED IN CANADA

SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA With a readership exceeding 145,000 senior executives, The Construction Source takes immense pride in providing an enticing platform to amplify your message to the most pivotal audience – your valued customers. Whether your aim is to promote an exciting new condo development, attract crucial financial investments for upcoming projects, or establish a commanding brand presence, we’re here to assist you every step of the way. To explore opportunities for featuring your company or showcasing your latest project in The Construction Source, please reach out to our Group Publisher. Jermaine Poulsen e: info@theconstructionsource.ca The Costruction Source Canada Suite 202 to 1201 Bay Street Toronto, Ontario M5R 2A5 E: info@theconstructionsource.ca Executive Publisher Jermaine Poulsen COO Alexandra Box Editor in Chief Zach Janes Director of Operations Jacqueline Van Belois Business Development Managers Catherine Ditchburn Production Manager Brennan Midghall Digital Strategist Pranim Thapa

SEPTEMBER 2026 SHIELD ENGINEERING & ARCHITECTURE Dependability, excellence, simplicity DISTRICT OF SAANICH Building to last AXIA DESIGN ASSOCIATES INC. Bringing people together CARRIER SEKANI FAMILY SERVICES (CSFS) Building a future ARCHITECTURE COUNSEL INC Telling a story SPA ENGINEERING Complete engineering solutions R&R POOLS Making lifelong memories DOMACO ENCOCORP CONSTRUCTION (DEC) Bigger tables, not higher fences CARTER BROS Built on famly values NEW TOWN ARCHITECTURE & ENGINEERING INC. All about time DOBBYN LIGHTNING PRODUCTION Raising the bar MEREDITH ROBB ARCHITECT Hearing the client VERANDA Building something grand INDUSTRY INNOVATIONS INCINERATING TOILETS IN THIS ISSUESEPTEMBER 2026 SPA ENGINEERING R & R POOLS

THE CONSTRUCTION SOURCE CANADA AXIA DESIGN ASSOCIATES INC.

SEPTEMBER 2026 Industry INNOVATIONS MODERN & ENVIRONMENTALLY FRIENDLY TOILET SOLUTIONS

THE CONSTRUCTION SOURCE CANADA Water connection not required Requires little space No odour Easy installation No frost protection needed Secure for children ash to be emptied No waste handling, only and more Bunkies, For Home, Cottages, Shops, 3 - 4 visits per hour High capacity Propane&Electric models ABOUT CINDERELLA ECO GROUP Cinderella Eco Group is a family-owned company located in the north-western coastal community of Midsund in Romsdal, with deep roots in the beautiful Norwegian fjord-landscape. We have more than 20 years’ experience with the Cinderella Incineration Toilet, a water-free, ecological solution for the management of toilet waste. Cinderella, the natural first choice for those who place high demands on quality and functionality. HIGHLIGHTS OF INCINERATION TOILETS:

SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA

ENGINEERING & ARCHITECTURE DEPENDABILITY, EXCELLENCE, SIMPLICITY

Shield Engineering & Architecture is a multidisciplinary firm based in Sudbury, Ontario, well known for delivering forward-thinking designs and innovative architectural, structural, mechanical, electrical, and civil engineering solutions to clients across the residential, commercial, institutional and industrial sectors. No matter the industry sector or project size, they take pride in delivering reliable, efficient, and high quality services that meet the unique needs and wants of their clients. Over the past six years, that approach has resulted in consistent growth. According to Kristin Beites, the firm’s lead architect, the firm’s success so far is a credit to the “three core values” that guide everything they do – dependability, excellence, and simplicity. Shield has been guided by those values from the start, ever since the firm was founded in 2020 by founding partners and principals Kyle May, Sean Portier, and Lex Romanko. All three were in the engineering and design field – structural, mechanical, and mechanical design, respectively – and had worked together at other offices before deciding to branch out on their own to serve Northern Ontario. Given the heavy concentration of mining activity in and around Sudbury and reaching much further north, most of their early work was industrial and mine-related. From there, the practice grew organically as connections led to new opportunities – a homeowner needing a house designed, a business owner with a commercial building to plan. Sector by sector, the firm’s scope expanded. That growth took a significant step forward in 2024, when Kristin joined the team and merged in her own small architectural practice, allowing Shield to offer engineering and architecture SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA

SEPTEMBER 2026 services under one roof for the first time. “I had my own small practice, and my projects were getting larger and more involved,” Kristin recalls. “I was thinking about whether I should be growing my business, and right at that moment, Shield approached me about running the architecture department. We met, we talked, and we really aligned on our vision for growth. They wanted to branch out from purely industrial work and didn’t have the expertise or connections to do that on their own – I brought that to the table, and I was drawn to how they wanted to grow and tackle different markets across the north.” Two years in, Kristin describes the partnership as a genuine success, built on shared knowledge and daily collaboration. “There’s a really nice synergy in having, for example, a structural engineer whose office is just down the hallway from mine,” she says. “When I’m designing something and we’ve got a challenging structural question, or even a question of whether something can happen the way I think it can, I can just walk down the hall and we can sit down and have an impromptu design meeting. That multidisciplinary approach has opened a lot of doors for us to get projects done in a timely manner and really serve what Northern Ontario is looking for.” These days, Shield serves a broad range of clients across a broad range of sectors on a broad range

THE CONSTRUCTION SOURCE CANADA of projects, reflecting the depth of their experience and expertise in-house. Their residential team, for example, handles everything from custom new builds and home additions to legalizing basement units, all the way up to multi-unit developments – including a 33-unit transitional housing project for an Indigenous nation in Sault Ste. Marie that recently broke ground, with completion set for spring 2027. On the commercial side, meanwhile, the firm has recently completed a number of interior retrofits, including some highly innovative ones. On one memorable recent project, they transformed a retail store into a virtual golf simulator. Kristin says they are always on the lookout for those kinds of unique and challenging projects. The industrial sector also remains a key strength of the company. Those projects range from pre-engineered warehouse buildings to large administrative facilities and dry buildings – the change rooms miners use before heading underground – for mine sites. Furthermore, Shield has recently moved into institutional work. Most notably, they are currently working on a high profile renovation project for Laurentian University in Sudbury. “Our projects are very diverse, and so is our clientele,” Kristin says. “It’s the nature of operating in Northern Ontario – the market isn’t big enough for us to be completely niche and only offer one type of service. Opening ourselves up to a broader

range of services creates a lot of opportunities.” Because they provide such a broad range of services, Shield can also provide clients with a simpler, more streamlined process. Kristin believes that’s a big part of what sets them apart. “The advantage for clients is we’re a one-stopshop,” she says. “If they have a question, they can call me as the prime consultant, and it’s not going to take a week to reach a mechanical engineer working on a dozen projects somewhere in Toronto. There’s a closeness and proximity that helps things get done in a streamlined way. “ “I think some people also find that having a table full of consultants representing different companies can be intimidating, especially for smaller projects,” she adds. “I think our northern clients appreciate dealing with one company that speaks on their behalf across every discipline.” SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA Leading the way As one example of what Shield Engineering & Architecture is capable of, Kristin points to their ongoing work at the Laurentian University, where they are in the middle of a multi-phase renovation project. That project began when the university issued a request for proposals seeking architectural lead design services for the re-roofing of four roofs across its campus, several of which were nearing the end of their lifecycle, leaking, or otherwise in need of upgrading. Shield submitted a bid and won. “I think they recognized we were a newer architecture firm on the scene in Sudbury, and they were impressed with the proposal we put together,” Kristin says. “Perhaps they wanted to branch out from the usual players who typically do this kind of work, and they felt confident that we could deliver.”

SEPTEMBER 2026 The project unfolded in two parts. Shield first investigated the condition of the roofs and produced a report proposing solutions, which the university reviewed and approved. From there, the firm developed construction drawings and issued a tender package so roofing contractors could bid on the scope of work. Construction is now underway in two phases – the first phase covers two roofs, with one nearly complete and the other roughly 85 percent finished, while work is just beginning on the remaining two roofs in phase two. “It’s going quite well,” Kristin says. “Like any renovation project, there have been unexpected discoveries and a few hiccups and changes in scope along the way, but we’ve worked really well with Laurentian to tackle those problems as they arise and keep the project moving forward on schedule.” A key partner in that progress has been Garland Canada, a premium provider of high-performance commercial roofing and building envelope systems. They have been involved with the project from its earliest stages. “It’s been a really great partnership,” Kristin says. “They offered amazing support right from the beginning with the product specifications and getting the right products chosen and the spec written properly. Now they’re heavily involved

THE CONSTRUCTION SOURCE CANADA in construction review – they’re on-site with us frequently, checking the workmanship and making sure everything is being applied correctly. We’ve really enjoyed working with them.” Beyond the Laurentian renovation, Shield’s current workload reflects the same diversity that has defined the firm from the start – including a large administrative building and dry facility under construction at a remote gold mine, several commercial interior retrofits in Sudbury, a warehouse and showroom expansion for a motorsport facility in Sault Ste. Marie, a daycare being designed in an old church, and a range of residential projects from single-family homes to a 30-unit apartment building. Moving forward, Kristin says the firm’s goal is to continue pursuing work across a diverse array of sectors. Again, she says being diverse is necessary in a place like northern Ontario, but more than that, she says it keeps things interesting “We like it,” she says. “We enjoy the diversity and the challenges that come with it. Every day is something different. It makes it fun to come to work.” Another goal, Kristin adds, is to make their projects more environmentally sustainable. That’s not currently a big focus for a lot of clients in their region, but they believe it will be soon and they want to be leading the way.

SEPTEMBER 2026 “One of the ways we’re interested in growing is by bringing sustainability values to the north,” she explains. “We have a couple of projects right now that have gone through energy modeling and energy audits, working closely with an energy modeller to help clients meet climate target goals – some of which are tied to funding. Not everyone up here thinks about those things yet, but we want to keep pushing the idea of what’s possible and being environmentally responsible.” Lastly, Kristin says the firm intends to grow, but they are not yet decided on how big they want to get. According to Kristin, that remains an open, ongoing conversation among the partners. “That’s a question the partners and I are discussing all the time – when do you keep growing, and when do you put the brakes on and perfect what you’ve already got,” she says. “Right now, I’m happy with the size of the architecture department, but if we land a few more big projects and need to bring on some great new people, I’m not opposed to that happening.” However big the firm grows, Kristin says the most important objective is doing right by their clients. She refers back to the Shield’s three core principles – no matter what size they are, or what kind of projects they are taking on, those values will continue to guide everything they do.

For more on Shield Engineering & Architect, their services, the markets they service, and their past projects – and to contact Kristin and the rest of their expert team – visit https://shieldeng.ca/ THE CONSTRUCTION SOURCE CANADA

BUILDING TO LAST

The District of Saanich, located just north of Victoria, is the largest and most populous municipality on Vancouver Island. While Victoria’s downtown has filled in with towers over the past decade, Saanich has grown alongside it – though it has always grown carefully, prioritizing environmental stewardship and quality of life for all. Currently, the district in the middle of one of the most ambitious infrastructure pushes in its history, which includes a new innovative fire station that has drawn attention from well beyond the region. Even in the midst of that push, however, the District’s leadership remains focused on growing the right way, and making sure the district remains a place that entrepreneurs, artists, farmers and families can be proud to call home. Stacy McGhee is the Program Manager of Strategic Facilities Planning within Saanich’s Engineering Department’s Facilities Division, and he’s personally lived in Saanich since moving there with his family in 2003. From his perspective, he says the district has been undergoing a gradual evolution rather than an awakening. “I don’t feel like it was this sleepy town that all of a sudden woke up,” Stacy says. “For many years, the leadership here has been very ambitious – but they’ve also placed a really high value on the protection of the environment and environmental sustainability. Everything we’ve done in terms of design and construction has followed from those values.” Those values matter because they explain why the district’s current wave of building projects looks the way it does. According to Stacy, the District isn’t just putting up replacement facilities – they’re making statements about how a midSEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA

SEPTEMBER 2026 sized Canadian municipality should build for the next century. One of the foundational documents guiding Saanich’s current building boom is the Strategic Facilities Master Plan, approved in April 2018. The plan identified the district’s most urgent facility needs, chief among them a redeveloped Saanich Operations Centre and a replacement for Fire Hall 2. Stacy is quick to note, however, that the plan’s real achievement wasn’t just identifying priorities – it was communicating them to the public. Rather than producing another dense technical report destined to sit unread after council approval, his team built the plan around a “report card” format that profiled each municipal facility for capacity, condition, and risk in a way an average resident could actually follow. “I didn’t know how it would be received,” Stacy recalls, “but it turned out people appreciated the work. They were excited to have something in front of them that they could understand, and that provided some clear direction for them.” That public engagement effort was substantial. Stacy spent roughly 60 hours in the public realm during two rounds of consultation, using boards, surveys, and direct conversation to gauge what mattered most to residents. What he found

THE CONSTRUCTION SOURCE CANADA surprised him. As it turned out, a striking number of people don’t connect their property taxes to the everyday services those taxes fund. “Several people told me, ‘Oh, streets and roads – I thought that was the province,’” Stacy says. “They didn’t know we provided all that.” For Stacy, closing that knowledge gap became central to the case for investing seriously in facilities rather than deferring maintenance indefinitely. “It’s not about the workspace being new or old that makes people happy to come to work,” Stacy explains. “Staff are working to deliver services for the residents of the District. If they have the proper facilities and equipment to do their jobs well, and the building accommodates growth and change, then you, as a tax paying resident, should be able to rely on those services.”

SEPTEMBER 2026 Setting a new standard As an example of the District of Saanich’s approach to facility building, Stacy points to their recent marquee project – the new Fire Station #2, currently in the final stages of construction. That project replaces a small, aging facility that badly needed a seismic upgrade, and the replacement is something considerably more ambitious than a like-for-like swap. The new station is a high-performance, two-storey structure that includes crew living quarters and a community meeting space, and it accommodates eight emergency vehicles and apparatus. More significantly, it is one of the first mass timber buildings in Canada designed to target a zero-carbon building standard while remaining fully equipped for post-disaster response, meaning it is engineered to stay operational following an earthquake or other major disaster. The District intends

THE CONSTRUCTION SOURCE CANADA it to function as a demonstration project, a template that other municipalities can look to when planning their own post-disaster facilities. The decision to pursue a project with a level of ambition wasn’t made lightly or quickly. Stacy explains that the process began with a feasibility study built around three scenarios – doing nothing and letting the existing facility continue to deteriorate, building to the District’s baseline standard of LEED Silver, and pursuing a highperformance option built around mass timber and a LEED Gold minimum. Each scenario was evaluated against an 80-year total lifecycle cost, not just an upfront construction budget. “The high-performance option actually came out the cheapest over 80 years,” Stacy says. “Not by a lot, but enough for council to take notice. To me, that’s the power of good design, particularly in the public realm.” Stacy believes that outcome captures something important about how public institutions should think about capital projects. “A municipality, a government owner, isn’t looking to build and flip a property for profit like a developer would,” he says. “These buildings have to work for many, many years, so it’s in their interest to think long-term. We live in an age of throwing away everything, including buildings, but we don’t want public dollars going toward something cheap that’s expensive to maintain

and run. We want to see something that’s going to last.” The finished fire hall, still in its final stages of completion, has already exceeded expectations architecturally. When early renderings were submitted for a 2019 development permit, several staff members compared the design to an art gallery rather than a fire hall. “I like that kind of comment,” Stacy says. “It tells me this isn’t an ugly industrial building dropped into a neighbourhood – it has an elegance, a form, and a level of detailing that fits a residential setting.” Building it required real technical creativity from the construction team. The station is a composite structure, with a steel vertical frame supporting cross-laminated timber panels across the floors and roof. “The architects didn’t want to see glulam beams hung below the roof, supporting it from underneath,” Stacy explains. “They wanted the beams above the roof, so we worked with structural engineers on a connection that holds the panels from the top instead. That’s why the apparatus bays end up with this huge, beautiful wood ceiling – but getting the insulation, the conduit runs, and the built-up roofing to work with that, especially once you add a photovoltaic array on top, took a lot of engineering to pull off.” Stacy credits the District’s contractor, Knappett SEPTEMBER 2026

Stacy credits the District’s contractor, Knappett Projects Inc. – a Victoria-based firm with over four decades of experience in both public and private construction – with navigating that complexity successfully. Their submission to the District’s Request for Proposals demonstrated their understanding of the Fire Department’s requirements. “It’s in the methodology section where you can really vet who has taken the time to read your requirements, and maybe even gone to the site,” Stacy explains. “When you get a proposal where a company has clearly thrown out their standard template and is genuinely excited about the project – that begins to separate the wheat from the chaff. Our experience shows that a low bidder is low for a reason, and once construction starts, you get hit with change orders.” Construction on Fire Station #2 is now in its final stretch. The first group of staff are expected to move in around in early October, though remaining site work will continue into the fall. The District has coordinated with British Columbia’s Ministry of Transportation and Transit on approvals related to the deployment apron and intersection signalling on the site’s north side. The original fire hall already partially demolished will be fully demolished once the new station’s apparatus bays are operational. Full site work, including landscaping, is expected to wrap by late November to early December, with a formal public opening planned for February or March of THE CONSTRUCTION SOURCE CANADA

next year, timed to coincide with new landscaping coming into bloom. That opening will also include a public art component. A local First Nations artist, Luke Marston, selected through a competition, has been commissioned to create a cast bronze sculpture that will be installed in front of the station. “I think that’s going to hugely add to the civic nature, the public nature of the facility,” Stacy says. “I can say right now, it’s a stunningly beautiful building,” he adds. “Over the coming years, I think it’s going to become quite an iconic building, something that sets new standards for the district, and I want to believe for the province and the country too. People will look at it and see what can be done with good planning and investment.” Fire Station #2 is far from the only major project the district has underway. Stacy is currently working on the redevelopment of the Saanich Operations Centre, formerly known as the Public Works Yard, a project with an estimated construction budget of $40 to $50 million. The District recently narrowed its request for qualifications down to three proponents, with an awarded construction manager expected by the end of September 2026 and detailed design beginning shortly after. Site activity is projected to begin within twelve to fourteen months, with an estimated 20-to-26month build that would carry the project into 2029. “I’m very excited for that, mostly because of our staff who’ve worked in substandard facilities now really for decades,” Stacy says. “Giving them a new home where they can do their jobs well – and probably even better than before – is really exciting.” Facilities aren’t the district’s only infrastructure story. Saanich’s water resources and transportation teams recently completed the Shelbourne Street Improvements Project, a $72 million undertaking ($46.6 million external and $25.7 million District funded) delivered in three phases over five years. The project replaced aging underground water and sewer infrastructure while reshaping the streetscape above it to better accommodate cyclists and pedestrians. Taken together with the facilities work, it reflects a municipality investing deliberately across both its vertical and horizontal infrastructure, treating public buildings and public streets as connected pieces of the same long-term commitment to residents. SEPTEMBER 2026

For more on the District of Saanich and their latest news and projects, visit www.saanich.ca THE CONSTRUCTION SOURCE CANADA

BRI PEOPLE

INGING E TOGETHER

AXIA is an international architecture and design studio with offices in Toronto and Hong Kong. Over the past 15 years, they have won a multitude of major design awards both nationally and internationally, and they have become well known for creating architecture that fosters community engagement, collaboration and contemplation. These days, their firm focuses on community and institutional work, which gives them opportunities to collaborate with “groups and individuals from all walks of life” – opportunities that their team “relishes,” according to founding partner Chris Wong. “We love getting deeply involved in community and stakeholder consultations,” Chris says. “We love translating the results of these processes into final products that build consensus among diverse groups, generate excitement, and contribute to the economic and environmental sustainability of neighbourhoods.” Chris originally formed AXIA in 2011 alongside his former classmate and longtime friend Taymoore Balbaa. After they both completed apprenticeships in top global design firms, they teamed up with a vision of doing more community-minded projects than they got the chance to as apprentices. Like many young firms, AXIA didn’t have an established client base to draw on in the beginning, so Chris and Taymoore built their reputation through design competitions. The strategy paid off, with the partners landing several top-three finishes early on and using that momentum to grow the practice together. Taymoore, unfortunately passed away a few years ago, but Chris says his influence is still felt throughout the studio. SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA

SEPTEMBER 2026 “His spirit still lives through us, and we continue on his behalf,” he says. In their early years, the firm took on a wide range of project types, including high-end commercial development work through their Hong Kong studio, alongside smaller projects in Toronto that helped build out its institutional portfolio. Today, that early groundwork has evolved into a clear focus. Social housing now makes up a significant part of AXIA’s practice, alongside community spaces such as community centres, as well as educational commissions for institutions and universities. One project the team is especially proud of is the Diwan, developed for the University of Alberta and the Aga Khan Trust for Culture. That project is a multi-purpose event space designed to host lectures, exhibitions, talks and conferences, set within the university’s Islamic Garden. According to Chris, what makes AXIA adept at projects like the Diwan is their sensitivity to culture and community context. He believes that’s also what makes them effective in the social housing space. He points out that social housing built in past decades in Canada – particularly from the 1970s – often carries a stigma because of poor design and maintenance. AXIA has made it their mission to challenge that association. “I do believe the quality of space and inspiring environments should be accessible to everyone, and not just the privileged.” According to Leisdania Reynoso, associate partner, AXIA is further set apart by their transparency

THE CONSTRUCTION SOURCE CANADA and openness. She believes that’s another reason clients keep choosing them. “We’re very open, we offer good communication, and we’re willing to go a little bit beyond in terms of design to get things to work well together and bring dignified design to everybody.” Michael Good, also an associate partner, agrees that the firm is “willing to go the extra mile,” and he says clients respond to that. He adds that the firm also firm invests heavily in stakeholder engagement – which he says can be a tricky stage of the process if not handled carefully. “It can cause friction,” he says, “but we’re very good at navigating it. We really work through options and designs to find the best possible scenario and solution for as many stakeholders as possible. That’s a big focus for us.”

SEPTEMBER 2026 Working together Internally, AXIA Design has cultivated a close-knit culture among their team members. The firm currently employs around 10 people, and both Michael and Leisdania point to that intimate scale as central to why they’ve stayed with the firm for years. Michael, who joined in 2016 after reconnecting with Taymoore, his former professor, says the quality of the work and the strength of his relationships with Chris and Leisdania have kept him there. “We really try to reinforce a nice balance of hierarchy where we’re all engaged in all of these projects,” he says. “It can be a very fun environment.” Chris adds that maintaining a studio-type setting has been deliberate. “That helps a lot with the kind of conversations and creativity flowing together.” Leisdania, who moved to Toronto from New York before joining

THE CONSTRUCTION SOURCE CANADA AXIA, says the people and the collaborative culture are what won her over during her interview and have kept her there since. “Design is collaborative, and there’s a really good work-life balance that we try to achieve,” she says. AXIA extends that same collaborative philosophy to the trades and construction partners they work with. Chris says the firm recognizes the value contractors and subcontractors bring to a project, particularly their on-the-ground knowledge of how things actually get built. “Working together is always important. We always try to be open-minded about different approaches, because the trades certainly have a lot of on-ground knowledge about how to put certain things together. So their feedback is important.” Chris notes that AXIA’s public-sector focus means the choice of contractor is often determined through a competitive bid process rather than the firm’s own selection, but that doesn’t change how they approach the relationship. “We try to keep a friendly and open-minded relationship, working with them and recognizing each other’s input.” Michael adds that one of the firm’s defining habits is producing thorough, well-resolved drawing sets before construction begins, which helps minimize the back-and-forth that can strain relationships on site. “I think that’s been one of our defining features in the last couple of years,” he says, “and it helps greatly with our relationship with trades and subtrades.”

SEPTEMBER 2026 Staying focused The Diwan remains one of the clearest and best examples of AXIA’s collaborative approach in action. That project began as an RFPbased design competition, which AXIA won, and the team also included interior designers Arriz + Co and architect of record Kasian Architecture. According to Chris, AXIA has always been drawn to sites with strong cultural significance. With the Diwan, he explains that the goal was to translate Islamic architectural references into a contemporary language without resorting to literal imagery. “Our building doesn’t look like a typical Islamic building. It doesn’t have a dome,” he says. “But the way we approach geometry, tectonics and materiality speaks to a coherent approach in grounding the building within the traditions of Islamic gardening. I think we won the submission in the first place because of our ability to really fit into the place of the project.”

THE CONSTRUCTION SOURCE CANADA Since opening to the public in early 2023, the Diwan has been well received by both visitors and the client. Chris says the response has been especially meaningful given the building’s connection to the Ismaili community, for whom it serves as a rare gathering point. “That community is often more scattered, and having a place that can ground them is very important. So it is meaningful to us on many different levels.” The finished project was also well-received by AXIA’s peers in the industry. At the 2023 International Architecture Awards, the project won the Exposition Centres category. The project also went on to receive a prestigious gold certification in the Public and Cultural Buildings category at the 2023 Grands Prix du Design Awards. Chris says that kind of recognition carries real weight. “A lot of times you might not be able to hear how people react to the building, because you’re not standing next to it talking to everyone who passes through,” he says. “So having the opportunity to be recognized with an award is always helpful. It’s positive feedback. It gives us extra motivation to continue, because the world of building is always complicated.” Michael describes the recognition as a rewarding payoff for years of sustained effort. “It’s a nice culmination of all your efforts. You spend months and sometimes years on these things, so it’s a positive thing to see when they’re well received.” Currently, AXIA is working on a wide range of projects, some very different to the Diwan – but with each of them, the goal remains to make a positive and meaningful impact. For example, they are now working on a series of social housing developments ranging from small six and five-unit

SEPTEMBER 2026 buildings to projects with as many as 140 units throughout Ontario. For example, in Ottawa, AXIA has partnered with another firm on transitional and social housing projects in Morrisburg and Cornwall. The firm is also handling renovation work for the Peel Regional Police at their 12th division, along with different renovation work for Toronto Community Housing Corporation. Moving forward, AXIA plans to keep leaning into that kind of institutional and community-driven work, including social housing – which Chris sees as increasingly important given the current state of housing in Canada – as well as educational and civic projects like university buildings, libraries and community centres. The firm also has plans to grow – but they don’t want to grow too fast and they never want to grow too big. “Once you grow to a certain size, you’re being controlled by your overhead,” Chris says. “You can’t pick and choose your projects anymore. We never want to get to that point.” Leisdania agrees, and she emphasizes that that growth should happen naturally rather than being forced. “We’re trying to grow organically. We’re not trying to push it too much. We definitely don’t want to be a humongous firm to the point that we have to break into teams and you never see your colleagues or know who’s working next to you.” “I don’t think we’ve ever actually sat down together and come up with a number of what the perfect size firm is, but I think we’re in agreement that we want to be a small-to-medium firm and we want to be very focused on the needs of our clients,” Michael concludes. “That’s what we’re looking for. At a certain point, if you grow too big, that kind of environment becomes very hard to maintain and running the firm becomes less about architecture. We want to stay focused on architecture.”

For more on AXIA, their vision, their past projects, and their long list of industry awards – and to get in touch with Chris, Michael, Leisdania, and the rest of their expert team – visit https://axiadesign.ca/ THE CONSTRUCTION SOURCE CANADA

BUILDING A FUTURE

Carrier Sekani Family Services (CSFS) is an Indigenous-led non-profit health and wellness organization based in Prince George, British Columbia. For over 35 years, they have been delivering holistic wellness services for Carrier and Sekani people – services rooted in culture and strengthened by evidence-based practice, reflecting the strengths, values and worldviews of the 11 member Nations they serve. In recent years, one of the most valuable services CSFS has provided is the planning, building, and managing of safe, stable, and culturally grounded physical spaces and housing. “Our vision is that children, families, and Elders can access the supports and connections they need without leaving their communities,” states Dr. Warner Adam, Chief Executive Officer. “By investing in housing, wellness, and community infrastructure, we are creating the conditions for people to thrive close to home. Our recent investments are only the beginning of the work needed to ensure Indigenous communities have the facilities and resources they deserve.” In order to see these investments advance, CSFS developed their ‘Housing, Capital, and Infrastructure Department,’ which they launched roughly two-and-a-half years ago following the passage of the Canadian Human Rights Tribunal Order 41. In a short time, that department has contributed to some highly significant infrastructure projects and programs, including a youth-friendly wellness centre, a culturally sensitive addictions treatment centre, and an Indigenous-led housing support project for Elders, young families, and youth and young adults transitioning out of government care. SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA

SEPTEMBER 2026 “For too long, colonial systems separated children from their families, communities, and identities,” says Dr. Jason Morgan-Gottschall, Executive Director for Housing, Capital and Infrastructure. “These systems were not accidental – they were designed. And because they were designed, they can be changed.” That belief is what drove Carrier and Sekani leadership and Elders to form an Indigenousled society with a mandate to reassert control over health, justice, and family services across the territories. As Jason puts it, the organization exists as “a vehicle to provide services back to the communities.” That mandate took on new dimensions in 2021, when the Canadian Human Rights Tribunal issued a legally binding order recognizing the chronic underfunding of First Nations child and family services, including infrastructure, and the systemic harm that underfunding has caused First Nations children. The order, brought forward by the First Nations Child & Family Caring Society alongside the Assembly of First Nations, required the Government of Canada to fund the infrastructure needed for First Nations children to receive services within their own communities. “This shifts infrastructure from being optional to essential,” Jason explains. “The absence of safe housing and service spaces has historically forced children to leave their families, communities, and cultures in order to access support services. For

THE CONSTRUCTION SOURCE CANADA the construction industry, this means that every housing and community infrastructure project is more than a building project – it is an investment in keeping children safely connected to their families, cultures, and Nations while upholding their human rights.” In response to that order, CSFS was able to launch the Housing, Capital and Infrastructure Department – a new operational division focused on planning, building, and managing safe, stable, and culturally grounded physical spaces and housing. Jason was asked to spearhead that division and he gladly accepted, as it related directly to the reason he joined the organization in the first place, which was to “help strengthen and build the institutional capacity of First Nations.” As the head of the Housing, Capital, and Infrastructure Department, Jason quickly went about building out a technical team that now includes an electrician, an architect, an engineer, an asset manager, and a project manager – thus providing in-house expertise member Nations can draw on directly. “We are building that technical capacity ourselves, so we can offer it to the First Nations communities we serve,” Jason says. “It’s an opportunity for us to provide comprehensive infrastructure planning that’s specific to First Nations child and family services.” That capacity has already translated into a slate of major projects. The first to open was ‘Foundry

Burns Lake’ – a youth-focused health and wellness hub that celebrated its grand opening last fall. Positioned across the street from the local high school, the centre delivers mental health and medical services alongside dedicated youthdepartment staff, serving young people roughly between the ages of 12 and 24. Jason would like to acknowledge and congratulate Dr. Travis Holyk, CSFS Chief Administrative Officer, who guided the project to completion. He says his efforts resulted in “an amazing facility” that has been “well received by the community.” The project’s success has been so significant that CSFS is now exploring opportunities to replicate the model in Vanderhoof, BC. South of Vanderhoof, on Saik’uz territory, the Tachick Lake Healing Centre is one of CSFS’ current major construction projects. The long-envisioned facility will provide year-round medical detox and residential addictions treatment in a culturally grounded, land-based setting, addressing what Jason describes as decades of advocacy for equitable access to addiction recovery services in northern BC. CSFS is currently forming an operational committee, along with an arts committee to guide the facility’s cultural and artistic elements, ahead of the handover to fulltime staff. “It’s going to be a fully staffed facility that provides for a lot of the pressing needs facing our membership,” Jason says. “Having that service available in the north is going to be very beneficial for member communities.” Another ambitious project underway is ‘Our Place to Dream’ – a 45-unit housing development in Prince George, BC, slated for construction completion in November, with operations beginning next April. At least 25 of the units are reserved for youth aging out of Ministry of Children and Family Development care at 19 years of age. Jason explains that population is too often met with homelessness, isolation, and systemic barriers once they leave the system. “This is not a failure of the youth,” he says. “It’s a failure of the system that’s currently in place.” The remaining units will support an Elders-inresidence program offering discounted housing in exchange for participation in community programming, as well as young families and grandparents raising grandchildren. Jason describes the project as more than a housing development. “It’s like a village, with wraparound services for education, health, and family service programming,” he says. “The project reflects a fundamental belief that every young person deserves not just shelter, but a future they can dream of.” Because CSFS operates their own health department, complete with nurses and doctors, the site can also serve as a drop-in space for health service delivery – an integration Jason calls one of the organization’s greatest strengths. “It’s not just a housing project,” he says. “It’s making sure our members have the ability to be supported in the place where they live.” SEPTEMBER 2026

THE CONSTRUCTION SOURCE CANADA Our way When it comes to executing on their infrastructure vision, CSFS chooses their construction partners very carefully. According to Jason, the organization looks for construction contractors and consultants willing to respect First Nations values and commit to genuine partnership. To formalize that expectation, CSFS developed supplementary general conditions to the industry standard CCDC 5B construction management contract. They embedded commitments to Indigenous participation, economic reconciliation, and capacity development directly into contract language. “We want to make sure the contract language is respectful and enforceable,” Jason says, “and that there’s cultural agility and an ability to reflect our values in how the project is developed.” Partners are also encouraged to complete the Nowh Guna (“Our Way”), which is a cultural competency training program specifically created by CSFS. That program is conducted by Elders and Knowledge Holders, and teaches participants to recognize historical truths, remove systemic barriers, and provide better services for Indigenous communities. In 2021, the organization was recognized for their work creating that program with a British Columbia Reconciliation Award.

SEPTEMBER 2026 Restoring balance Moving forward, the goal for CSFS’ Housing, Capital and Infrastructure Department is to continue building safe, accessible, and culturally appropriate spaces so that member Nations have reliable access to high-quality facilities now and in the future. In delivering those spaces, however, Jason hopes the department’s work is judged by more than simply technical compliance. “We want sustainability to be grounded in our Indigenous laws, knowledge, and responsibilities to our people, rather than being a purely technical exercise,” he says. Proper grounding, Jason explains, means embedding Indigenous knowledge systems into design and planning from the outset – ensuring, for instance, that housing developments include gathering spaces and opportunities for human connection. It also means treating long-term stewardship as a governance obligation, with Elders included directly in the planning process and community priorities kept at the forefront of every decision. “Infrastructure is a tool for healing, prevention, and community wellbeing. Development restores balance between people and the land.” For Jason, that philosophy connects directly back to the long-term vision laid out in the Spirit Bear Plan, developed by the First Nations Child & Family Caring Society – a vision centered on ensuring First Nations children grow up safe, loved, and connected to their culture, without ever having to leave their community to receive the services or housing they need. It’s a responsibility Jason says CSFS carries seriously, one project at a time.

For more on Carrier Sekani Family Services, their mission, their current projects, and their latest news – and for more on Jason and the Housing, Capital, and Infrastructure Department – visit www.csfs.org/projects THE CONSTRUCTION SOURCE CANADA

EMPOWERED TO GROW

Walker Construction in Grey-Bruce is a regional division of Walker Industries, a fifth-generation, family-owned Canadian company with a longstanding mission of improving Ontario communities. In 2019, that mission led Walker to acquiring Harold Sutherland Construction, a longstanding local business based in Kemble, Ontario. For over 50 years, Harold Sutherland Construction had been fiercely dedicated to improving the roadways and residential areas in Grey and Bruce counties, leading to consistent growth and improvement. As part of the Walker family, that dedication has remained a constant, as has the pattern of evolution – with every passing year, Walker Construction in Grey-Bruce continues to expand while offering an increasingly high standard of quality and service. “That evolution is a credit to Walker,” says Andrew Pappas, construction manager. They’ve invested quite a bit in new equipment and training opportunities for our staff. They believe in us and are empowering us to grow. That’s why they purchased the company – because they believed we could grow and they wanted to help make it happen.” Andrew personally started working with Walker in 2019, shortly after the acquisition. In his time there, he’s seen a lot change but also a lot stay the same. “When I first joined, there was a good group of employees, including quite a few legacy employees, and we were doing work all over Grey-Bruce County, which isn’t all that different from what happens now,” Andrew explains. The biggest shift, he says, has been in scope. Where Harold Sutherland Construction once operated as SEPTEMBER 2026

RkJQdWJsaXNoZXIy OTYzNTg=