The Construction Source

SEPTEMBER 2026 Another standout project was the reconstruction of the Highway 10 connecting link through Flesherton, an 800-metre stretch that involved storm sewer replacement, new granular, improved drainage, new sidewalk, a retaining wall, and three lifts of asphalt, all while keeping local businesses accessible throughout a two-year contract spanning 2023 and 2024. With no MTO-rated detour route available for the provincial highway, the team relied on traffic control staff, temporary signals and detailed staging plans to keep traffic moving in all directions. “It was a significant amount of effort every day to manage traffic and mitigate the impact on both motorists and construction,” Andrew says. Despite the disruption a full town reconstruction inevitably causes, the crew completed paving and reinstated the sidewalk before winter set in, easing the burden on the community heading into the colder months. Moving forward, Walker Construction in Grey-Bruce hopes to continue taking on complex, challenging, and genuinely impactful projects along those lines. They also want to keep growing – and they believe they have plenty of room to do that.

RkJQdWJsaXNoZXIy OTYzNTg=