The Construction Source

THE CONSTRUCTION SOURCE CANADA it to function as a demonstration project, a template that other municipalities can look to when planning their own post-disaster facilities. The decision to pursue a project with a level of ambition wasn’t made lightly or quickly. Stacy explains that the process began with a feasibility study built around three scenarios – doing nothing and letting the existing facility continue to deteriorate, building to the District’s baseline standard of LEED Silver, and pursuing a highperformance option built around mass timber and a LEED Gold minimum. Each scenario was evaluated against an 80-year total lifecycle cost, not just an upfront construction budget. “The high-performance option actually came out the cheapest over 80 years,” Stacy says. “Not by a lot, but enough for council to take notice. To me, that’s the power of good design, particularly in the public realm.” Stacy believes that outcome captures something important about how public institutions should think about capital projects. “A municipality, a government owner, isn’t looking to build and flip a property for profit like a developer would,” he says. “These buildings have to work for many, many years, so it’s in their interest to think long-term. We live in an age of throwing away everything, including buildings, but we don’t want public dollars going toward something cheap that’s expensive to maintain

RkJQdWJsaXNoZXIy OTYzNTg=