The Construction Source

brand and their demographic and what they wanted out of the project – and that’s what we designed towards.” On ClockWork, what they wanted was to “set a tone,” Dan explains, as that project comprised just the first two buildings in what is going to be a much larger multi-building development. Everything that came after would naturally have to take cues from that first space: “We took a really close look at the materials and finishes. We looked at the programming of the amenities of the space and considered how to disperse them between the two buildings we were working within. We looked really closely at the exterior amenities program, which was really large, and we really considered how the community was going to use those outdoor amenities throughout the year and the four seasons.” Harbourwalk at Lakeview, meanwhile, is a condo development located within the Lakeview Village Master-Planned Waterfront Community in Mississauga. As a whole, Lakeview Village will span across 177 acres along Mississauga’s waterfront, and will be comprised of more than 8,000 new homes, 1.8 million square feet of new office space, 200,000 square feet of retail space, and 12 acres of campus and cultural lands. Harbourwalk will consist of two buildings and will be one of the first releases in the community – and like other masterplan projects of this scale, it was designed to be tone-setting. At the BILD Awards, AUGUST 2023

RkJQdWJsaXNoZXIy OTYzNTg=